I've never in my life (25 years in the business) seen a system that was so utilized things needed to be cut. Every single cluster/DC I've worked with has been at 50-85% utilization tops. I mean, they might hit 100% during a report generation period or something, but the 95% avg I've seen has never exceeded maybe 80%.