For this to be accurate, you're saying 160% aka 1.6 or 64 to 80 hrs per week, with 96hrs as the extreme?
Anecdotally, a hybrid technical manager I had in the past worked 60 hours a week pretty much minimum. Which sucks.
For this to be accurate, you're saying 160% aka 1.6 or 64 to 80 hrs per week, with 96hrs as the extreme?