At scale it takes significantly less time because the designs are familiar and there are not mobilizations and demobilizations. The next framing job is on the next lot.
So if a technology could cut that cost in half it would be desirable even if it took twice as long because in real terms your final cost drops 10% and only takes 2 more weeks.